Difference between revisions of "Milestone 2 Submissions"
From crowdresearch
Line 5: | Line 5: | ||
== Convectors == | == Convectors == | ||
− | ===Link=== | + | ===Link=== |
− | This is the link to our group's submission (replace the following with your submission link): [[Milestone 2 | + | This is the link to our group's submission (replace the following with your submission link): [[Milestone 2 convectors]] |
== TeamNameExample2 == | == TeamNameExample2 == |
Revision as of 23:39, 10 March 2015
Due date: 11:59 pm 11th March 2015 for submission, 9 am 13th March 2015 for peer-evaluation. Everyone, please note that the Daylight Saving Time (United States) 2015 begins at 2:00 AM on Sunday, March 8. People out of the US might want to track the new changes.
In this page, we're trying to have a collection of all the submissions made for Milestone 2. Please add your submission to the list!
Contents
Convectors
Link
This is the link to our group's submission (replace the following with your submission link): Milestone 2 convectors
TeamNameExample2
Link
This is the link to our group's submission (replace the following with your submission link): Milestone 2 Template